Connect with us

Servers computers

HP Blade 460c Gen 7 Conversion, cheap Server

Published

on

HP Blade 460c Gen 7 Conversion, cheap Server



A quick ‘how to’ convert a HP Blade Server for use outside of it’s original Blade housing. Cheap and cheerful project which can easily out match a desktop PC in terms of huge amounts of RAM.

The full conversion can be seen on my blog post – http://ubl0g.blogspot.com/2020/10/project-blade-network-server.html

Background royalty free music courtesy of Enrique27Naveda from Pixabay

source

Continue Reading
Advertisement
9 Comments

9 Comments

  1. @MrArmyguy11b

    October 2, 2024 at 1:02 am

    Ok, so do you need one power module per server blade??

  2. @PrinceJay1st

    October 2, 2024 at 1:02 am

    My blade server does not turn on when I apply 12v I'm getting an orange light on the power button and a green blinking led on the board. Any suggestions?

  3. @collecter3456

    October 2, 2024 at 1:02 am

    You stated that they were good at memory and cpu intensive tasks, what does that mean? Does that mean that it would be a suitable desktop computer? Great video by the way.

  4. @chilledbroccoli899

    October 2, 2024 at 1:02 am

    This video made me laugh exelent editing the piano one the scuffed photos such a top detail.
    But I'm here to know which suv cable or console cable do I get, are they universal or do I need a different one for my version Wich is a bl 460c G6?

  5. @roberthendry3992

    October 2, 2024 at 1:02 am

    can you do this to Gen 8 as well? I am desperate!

  6. @coyokyt

    October 2, 2024 at 1:02 am

    Me ayudas con la modificación que realizaste a la fuente de poder

  7. @ZeroBudgetDevelopments

    October 2, 2024 at 1:02 am

    Love this just got some gen 7 opterons 12 blades and a c7000 for £250 and want to upgrade to gen 9 blades i found this and hopefully ill be able to do this so the gen 6 and 7s dont become redundant

  8. @win7best

    October 2, 2024 at 1:02 am

    You should have gotten a gpu chassis for 2 pcie slots

  9. @philipeverts6236

    October 2, 2024 at 1:02 am

    I love the video, I wanted to ask you if you know if the bl490c g9 version has the same power connector pinout on the back. Thank you very much for your help 🙂

You must be logged in to post a comment Login

Leave a Reply

Servers computers

Dell Blade Server Cost (PowerEdge M420, M520, M620, M820, M910, M915)

Published

on

Dell Blade Server Cost (PowerEdge M420, M520, M620, M820, M910, M915)



http://bit.ly/newDellCoupon
Find the latest Dell PowerEdge M420, M520, M620, M820, M910, M915 Blade server cost and discount coupon code .

source

Continue Reading

Servers computers

What's the difference between a server and a cloud hosting?

Published

on

What's the difference between a server and a cloud hosting?



Want to learn more? Check out our free course on tech management for startups: link: https://myctofriend.co/htbasaccess

If you have a specific question for your project, just go ahead and ask on: https://myctofriend.co/ask
Get all the links mentioned and the print-ready notes here: https://myctofriend.co/videos/

Sacha and his cofounder already developed the first version of their product. They are now undertaking the Version 2 of their development and are considering moving to Amazon Web Services (AWS) as their cloud hosting solution.

Moving an application to the cloud is usually a very good option because you are not renting a server anymore but buying a delivered service instead.

Advertisement

Let’s see how cloud services work.

If you want to know more about us and our program, visit: https://myctofriend.co
—————————-
If you want to swing into action and build a startup without a CTO, then check out our FREE course: “How to build a Startup without a CTO” : https://myctofriend.co/htbasaccess .

source

Continue Reading

Servers computers

Dell EMC PowerEdge FX2s , 4 x PowerEdge FC630 Server Blades , Modular Infrastructure !! CTOServers

Published

on

Dell EMC PowerEdge FX2s , 4 x PowerEdge FC630 Server Blades , Modular Infrastructure !! CTOServers



One of our Configured to Order Solutions. Configured to our customers specifications ! For all your bespoke IT Hardware solutions at great prices , please contact : sales@ctoservers.co.uk

HPC Solutions for :
Computational science , mathematical and computational modelling and simulation , numerical analysis , quantum physics , Weather forecasting , weather simulation , Climatology , oil and gas exploration , Computational chemistry , Machine Learning , Deep Learning , medical imaging , structural mechanics , bioinformatics , Hyper-converged infrastructures , BIG DATA , Internet of Things (IoT), artificial intelligence ( AI ) , Engineering Simulation , Cloud Computing , Cluster HPC. ISCI , SAN , DATA Storage Solutions , Servers , Enterprise Hardware ,

Autodesk 3ds Max , Blender , Form-Z , Adobe Premiere Pro , Carrara , Autodesk Maya , Maxon Cinema 4D , Autodesk Softimage , Luxology Modo , Newtek Lightwave 3D , Rhino 5 , Revit 2017 , V-Ray , Mental Ray , Maxwell , Scanline , Software Renderer , Standard Renderer , Physical Renderer , Advanced Renderer , Kray , Cycles , Indigo , TopSolid , PowerMILL , WorkNC , HeeksCAD , Tebis , SprutCAM , I-DEAS , SolidCAM , T-FLEX CAD , Vericut , Fusion 360 , Autodesk Inventor , Autodesk Autocad , Autodesk HSM , Solidworks , CATIA V5 ,

Hewlett Packard Enterprise , HPE , HP , DELL EMC , DELL , IBM , Fujitsu , ASUS Supermicro #DELL #FX2s #Server .

source

Advertisement
Continue Reading

Servers computers

Virtual Machines vs Containers

Published

on

Virtual Machines vs Containers



This is an animated video explaining the difference between virtual machines and containers.

►►RoboForm Everywhere https://bit.ly/3S05wAM (affiliate) Save up to 42% using my link.
►►RoboForm Free https://www.roboform.com/lp?frm=rfp-012&affid=pcert .

source

Continue Reading

Servers computers

blade server chassis

Published

on

blade server chassis



Key features and benefits:

1. Hot-swappable technology: The hot-swappable feature of this blade chassis allows components to be replaced seamlessly without interrupting ongoing operations. This means businesses can easily upgrade or replace server blades and modules while the system is still running, eliminating costly downtime.

2. Modular design: The blade chassis is designed to accommodate multiple blade servers and subsystems, making it highly scalable as per the requirements of the organization. This modular design ensures businesses can easily expand their infrastructure without major disruption or additional investment.

3. Managed infrastructure: The fully managed infrastructure of the server blade chassis brings a new level of control and optimization to the data center. With centralized management and monitoring, administrators can easily configure and control every aspect of the system, ensuring optimal performance and resource allocation.

Advertisement

4. Energy efficiency: server blade chassis are designed to maximize energy efficiency. By consolidating multiple servers into a single chassis, enterprises can significantly reduce power consumption and CO2 emissions, contributing to a greener, more sustainable future.

in conclusion:

In summary, the IDC Hot-Swappable 10-subsystem managed blade server chassis represents a significant advancement in data center technology. With its hot-swappable capabilities, modular design and fully managed infrastructure, this innovative solution provides enterprises with unparalleled flexibility, scalability and efficiency. As demands on data centers continue to grow, it is critical for organizations to adopt cutting-edge solutions like IDC blade server chassis to stay ahead of the curve. Evolution is inevitable, and the IDC Hot-Swappable 10-Subsystem Managed Blade Server Chassis is paving the way for the data center of the future.

source

Advertisement
Continue Reading

Servers computers

Epyc Server Setup and Testing Continues

Published

on

Epyc Server Setup and Testing Continues

source

Continue Reading

Trending

Copyright © 2024 WordupNews.com